  • CVT 교정을 위한 UHV(H) 전력 주파수 AC 시리즈 공진 테스트 시스템

    UHV(H) 시리즈 인덕턴스 조정 가능한 공진 시스템은 500kV 이하의 CVT 및 전자기 변압기에 대한 내전압 테스트에 사용할 수 있습니다. 그리고 시스템은 주로 AC 전원, 여자 변압기, 고전압 리액터 등으로 구성됩니다.

    CVT 교정을 위한 UHV(H) 전력 주파수 AC 시리즈 공진 테스트 시스템의 제품 세부 정보



    UHV(H) AC Resonant Test System for CVT

    IMG_9249

    The calibration of capacitive voltage transformers (CVTs) requires testing to be conducted strictly at a 50Hz frequency. However, complex on-site geographical conditions often make it difficult for traditional testing devices to meet the requirements for handling and operation in the field. In response, the series resonant boosting device, as the first domestically developed field-adjustable resonance device in China, has been widely adopted for on-site calibration of capacitor voltage transformers at 500 kV and below.




    Fundamental principle

    Power frequency resonance is divided series resonance and parallel resonance, the two ways to take compensation effect of power capacity is basically thesame, after reaching full compensation, the input capacity can be reduced to 1 / Q or less of test output capacity.


    IMG_5636-2

    기술적인 매개변수

    Rated Capacity: 80kVA

    rated voltage: 160kV

    Adjustable inductance range: 65~130H

    Rated frequency: 50Hz

    Rated current: 0.5A

    Adjustable gap range:0~300mm


    Operations

    1. Over-current protection setting: 0.7 times of the rated current of the control unit. Example: the rated current of the control unit is 27A, the matched mutual inductor is 30/5, should adjust the current relay to be 3.3A. 

    2. Voltage withstanding time setting: set the time of the time relay to requiredtime. 

    3. Connect and check test wires according the pictures, close the console breaker, adjust the regulator to 0 if it not at 0 position. Do not connect the mainpower, adjust the space of reactor iron core, check if the up-down and limit protectionarenormal. 

    4. Close main power, press “boost” button, the reactor get hundreds of voltage,tuned by changing the air gap to achieve the highest output voltage, tuningiscompleted at this time, you can boost voltage, it will auto time (voltage withstandtime) after achieve the test voltage value, and will auto back to 0 after to voltagewithstanding time. 

    5. Off the main power,During the test, relevant person should strengthen monitoring equipment under test, once there was abnormal phenomenon should quick buck regulator, andalso disconnect the power.











    당신도 좋아할 수도 있습니다

    • 질문이 있으세요!

      언제든지 주저하지 말고 연락주세요
      문의하기
    • 우리를 방문하세요

      6호관, Optics Valley 광학-기계 산업 단지, 84 Gaoxin 5 Road,
      중국 후베이성 ​​우한시 이스트 레이크 신기술 개발구

    • 이메일을 보내주세요

      qiao@hvtest.cc

    • 전화주세요

      +86-15871365102