qiao@hvtest.cc15871365102
  • YDQ 팽창식 유형 AC Hipot 시험 변압기 고전압 Hipot 시험 세트

    YDQ 시리즈 50~120kV SF6 가스 유형 테스트 변압기는 주로 제어 상자, 테스트 변압기 등으로 구성됩니다. 케이블, 전기 부품, 절연 재료 등에 대한 전력 주파수 AC DC 내전압 테스트를 수행할 수 있습니다.

    YDQ 풍선형 AC Hipot 테스트 변압기 고전압 Hipot 테스트 세트의 제품 세부 정보




    YDQ Gas Type AC/DC Hipot Test Set

    Product Introduction

    YDQ series AC Hipot Test Set are essential equipments during electrical equipments tests and preventive tests. With the development of China's power industry, people required higher about the voltage class of testing transformer, and the traditional oil / dry type test transformer cannot meet the requirement in volume, weight, and functions.

    With the development of Chinese basic scientific research, the appliance of new material and new workmanship, the new medium SF6 enter the electrical equipment applications. The SF6 widely used because of its excellent insulating properties and arc performance and incombustible.

    AC Hipot Test Set compared with the traditional oil / dry type test transformer, 20%-60% reduction in weight (depend on the voltage and capacity class), without oil pollution, voltage class can up to 300kV, less than 2Pc under rated voltage. It is especially suitable for condition of working or moving frequently.


    Product Characteristics
    1、The inflatable test transformer is compact in size and lightweight, weighing 40%–65% less than oil-immersed transformers of the same grade.
    2、It operates without oil or grease, requiring virtually no maintenance.
    3、The unit is resistant to adverse weather and environmental conditions, remains stable during field transport, and is ready for immediate testing on-site.
    4、It offers significantly higher insulation strength compared to oil-immersed transformers and produces minimal corona discharge.

    HTY_1016


    서비스 조건
    1. Rated conditions requirements of AC testing transformer:
    A. Ambient temperature : maximum: +40 ℃ minimum:-20 ℃
    B. Maximum relative humidity, when the air temperature is 25 ℃, relative humidity less than 85%.
    C. Installation site without seriously affecting the transformer insulating gas, steam, chemical dust, dirt and other explosive media.
    D. AC test transformer the input voltage gradually increases and the output should be with sufficient protection resistor in series, should open/close under high voltage.
    2. Allowed running time
    Under rated voltage of rated capacity, continuous operation shall not exceed half an hour, every interval time is 5-10 times of working time, in order to ensure adequate cooling of the transformer, under rated voltage and two-thirds of the rated current allows long-term continuous operation


    Working principle
    Input power to control cabinet which with over-current tripping and zero interlock devices, input to YDQ primary winding through, according to the principle of electromagnetic induction, in accordance with the turns ratio of primary winding and secondary winding to get multiples of the same voltage amplitude - frequency high voltage at the secondary (high voltage) winding side. DC high voltage can be obtained by this high -frequency voltage through high voltage silicon rectifier stack and regulator capacitor filtered, and its high-frequency RMS amplitude is 2 times of this high-frequency voltage.








    당신도 좋아할 수도 있습니다

    • 질문이 있으세요!

      언제든지 주저하지 말고 연락주세요
      문의하기
    • 우리를 방문하세요

      6호관, Optics Valley 광학-기계 산업 단지, 84 Gaoxin 5 Road,
      중국 후베이성 ​​우한시 이스트 레이크 신기술 개발구

    • 이메일을 보내주세요

      qiao@hvtest.cc

    • 전화주세요

      +86-15871365102